2. Electric allows runtime bearing temperature shall not exceed 95 ° c (thermometer). Bearing eachRun for 2,500 hours (about six months) check at least once. Metamorphic found bearing grease must be replaced immediately. Replace the front, within the bearing cover, oil storage boxes shall be waste and tubing, oil cups of oil drain device clean and clean the bearings. Grease ZL3 Lithium complex grease is recommended special grease for small motors, oil added to added to the 1/3~1/2 about the bearing cavity. Bearing grade table.3. H80~132 inside and outside the frame size motors have no bearing cover. When removing the motor, should remove air cover, and then tear down the shaft end of the v-shaped shaft sealing ring, remove the fixing bolts of the front cover, back cover, back cover along with the rotors, fans jump out.4. Motor humidity, must be dried before use. Drying drying can be used or the method of short circuit current. During the baking process, the temperature should be increased, but not to exceed 145 degrees centigrade. Short-circuit current method is used when dry (severe damp motor should not use this method to avoid electrolysis phenomenon. ), Motor is in short mode, 0.6~0.8 times the rated current value input current is appropriate.5. When replacing the windings, shall note the original winding type, size and wire gauge, number of turns. Feel free to change the design will make the motor winding or performance degradation, so that cannot be used.6. Parts repair, replacement, maintenance must be conducted by professional and technical personnel in accordance with relevant technical standards, and acceptance.7. In order to ensure the normal operation of the motor, should be based on the actual use of the motor to carry out regular inspection and maintenance once a year.
đang được dịch, vui lòng đợi..
