The unit head and spindle structure as a whole, since water axis advance into the pit, in front of the generator shaft into theRecognize water shaft height should be higher than the design height of the top flange about 5 mm (as shown in the following figure: coupling flange water shaft and generator spindlesDesign installation height for the EL:89.600m, site in front of the shaft into the pit of water in the lower part of the wheel shaft into the riser block water machineFlange surface elevation can be adjusted to EL:89.605m), if the shaft flange on the top of water height below the design and installation of elevation, then the generatorInto the thrust hanging on the mirror plate, shaft flange there is a gap between the two, the generator shaft connected to the turbine axis will not be able to, thusResulting in "the 12th chapter" hanging into the shaft of the rotor is not possible
đang được dịch, vui lòng đợi..