The unit thrust spindle head and an integrated structure, since the water has been suspended ahead of the crankshaft into the machine pit, hanging in front of the generator shaft should indeed
recognize water shaft flange top surface elevation should be higher than the design height of about 5 mm (below figure: water coupling flange shaft and generator shaft of
surface design and installation elevation EL: 89.600m, the actual site before the machine into the water pit shaft hoists in the lower adjustment plate into the water wheel shaft the
flange surface elevation adjusted EL: 89.605m to), Flow shaft elevation below the top surface of flange design and installation elevation, then the generator
after lifting the main thrust head hanging in the mirror plate, two shaft flange there is a gap between the surfaces, and the turbine generator shaft axis will not be able to connect, thus
resulting in not perform "twelfth chapter" hanging in front of the rotor shaft alignment