4. strip Foundation for this project, because the employer did not provide geological exploration report, characteristic value of subgrade bearing capacity according to fak=80Kpa design.
4. This project uses strip foundation, due to the construction unit Unavailable exploration report, the foundation bearing capacity value by fak = 80Kpa design.
4 this project uses the strip foundation, because the construction unit did not provide the geological survey report, the foundation bearing capacity characteristic value according to the fak=80Kpa design.